Websites, shops and web applications · post-launch care · Krakow, Poland · since 2016
Updated October 5, 2026

How much does a business website cost in Poland? Price components and realistic ranges (2026)

Website prices in Poland in 2026: realistic ranges for builders, freelancers and agencies in PLN and EUR, what the price is made of and how to compare quotes — from a web development company in Krakow.

“How much does a website cost?” is a question the internet answers in unison: it depends. True — but useless. After well over a decade of scoping projects, we know a more useful answer exists: show what the price is made of, what really drives it up, and the ranges each path realistically falls into.

The prices below come from the Polish market. We are a web development company in Krakow, Poland — inside the EU and working in the CET time zone — so these ranges are most useful if your company is considering outsourcing a website to Poland, or simply wants to compare local quotes with Polish ones. Amounts are given in PLN with an approximate euro equivalent.

The short answer: four paths, four price levels

PathRealistic starting costBest for
Website builder (Wix, WordPress.com, Squarespace)from ~0–100 PLN/month (≈ €0–25)testing an idea, hobby projects
Freelancer~1,500–6,000 PLN (≈ €340–1,370)simple websites on a tight budget
Agency — fixed-scope packagefrom 4,900 PLN net (≈ €1,120; our Business Card package)companies that want a predictable scope and ongoing care
Custom projectusually from 8,000 PLN net (≈ €1,820)larger websites, multiple languages, integrations

The prices in this table are the launch cost — the full picture also includes yearly costs, covered below. Euro amounts are approximate, converted at the National Bank of Poland (NBP) rate of 5 October 2026 (EUR 1 = PLN 4.3855) and rounded; our current packages are listed on the pricing page.

What a website price is made of

Every honest quote is a sum of the same seven components — only their weight differs:

  1. Scope and structure — what the website should achieve, for whom, which pages and user journeys.
  2. UX/UI design — from a layout based on an existing design system to a fully custom design. One of the two largest cost components.
  3. Content — who writes the copy and prepares the photos. Underestimated in 9 out of 10 quotes: “content provided by the client” sounds cheap until the project stalls for 2 months because the content never arrives.
  4. Development — code, CMS, mobile version, performance. The second largest component.
  5. Technical SEO and analytics — meta data, structured data, sitemap, properly configured GA4. Cheap at build time, expensive to fix later.
  6. Infrastructure — hosting, domain, SSL, email. A small line in the quote, but the one that decides whether the website is still fast and secure a year later.
  7. Post-launch care — updates, backups, monitoring, small changes. The only component that never ends, which is why we covered it separately: how much website maintenance costs.

What drives the price up the most

A simple pattern emerges from our quotes — budgets jump when these come into play:

  • Content and languages — every language version is not “a translation” but a second full set of content, structure and SEO.
  • Integrations — CRM, ERP, payments, invoicing, warehouse. A single integration can cost more than a simple website.
  • Data migration — moving products, customers and orders from a previous e-commerce system is the line item that regularly surprises people: the data has to be mapped and cleaned, not just moved.
  • A custom design system — instead of a layout built on a proven base.
  • Dynamic features — user accounts, bookings, client panels, a custom CMS.
  • Legal requirements — WCAG, industry regulations, non-standard GDPR needs.

Costs you won’t see in the quote

When comparing offers, ask about what often sits outside the price:

  • licences — many projects, especially smaller ones, can be built without paid plugins or recurring fees; with unusual features and integrations, a few hundred PLN per year is perfectly normal,
  • hosting, domain and email after the first year — our package includes them for 12 months; after that, hosting is 500 PLN net per year (≈ €115) and business email is billed separately (150 PLN net per year for 10 GB mailboxes, ≈ €35),
  • copyright and access — whether the website, content and accounts belong to you (if not, read what to do when your vendor disappears),
  • changes after launch — on what terms and at what cost.

Why the price spread is so wide

Because “a website” describes both a five-page business card and a three-language service with an ERP integration. Two seemingly similar websites differ in content scope, process and what happens after launch. The cheapest offer usually isn’t bad because it’s cheap — it’s risky because the scope is vague and the surprises arrive after go-live.

The other thing quotes rarely mention: the launch cost doesn’t close the topic. A website delivers results when it is developed, measured and maintained after launch — and that belongs in the budget from day one.

How to compare quotes: 6 questions

  1. What exactly is in scope — how many pages, how many templates, whose content?
  2. What will the website be built on, and can it be developed without its author?
  3. What about hosting, domain and email — who owns them, who pays, from when?
  4. What does the price cover after launch, and what is billed separately?
  5. What are the timelines — and what usually extends them?
  6. Who owns the copyright and all the access?

If two quotes differ by a factor of two, they almost always answer these questions differently.

Our one transparent price

For company websites, the only price we publish upfront is the Business Card package: from 4,900 PLN net (≈ €1,120) — up to 5 pages, design based on our design system, built on WordPress or a lightweight static stack, technical SEO with GA4, plus hosting, SSL and domain included for 12 months. Delivery takes around 3–4 weeks. Details in our pricing.

Larger websites are quoted individually — they usually start from 8,000 PLN net (≈ €1,820), with delivery between 6 and 12 weeks, though for complex projects there is no real upper limit. Tell us what you’re planning and we’ll come back with specifics. And if you already have a website and would first like to check whether you’re overpaying for its infrastructure, start with a free cost audit.

Next step

Describe your project. We reply within 24 hours.

Tell us what you need: the address of your current website, the goal and what gets in the way today. We come back with a concrete next step or two or three questions. If you would rather start with a free audit of your hosting and email costs, just say so in the message.

The simplest start is a short description of your project. If it is not a fit for us, we will say so.

Describe your project — we reply in 24 h